|
|
|
|
|
|
Client: Comfort Central, Inc. - Pisgah Forest, NC Site: Brevard, NC Services: 3 - 3/4" Vertical Loops to 180' Project Status: Completed June 2009
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
Client: Evans Heating & Cooling - Glade Valley, NC Site: Boone, NC Services: 2 - 3/4" vertical loops to 150' Project Status: Completed 11/27/2009
|
|
|
|
|
|
|
|
Testimonial
|
|
|
|
|
|
I am writing to endorse Go! Green Drilling, Inc. In the summer of 2009 my wife and I determined that a geothermal installation would be a great investment. At that time both our state (North Carolina) and the Federal Government were willing to pay almost 2/3’s of the cost of the entire system.
As it turned out the original idea of running one long trench for the heat exchanger was not viable, since our property sits on bedrock. Consequently, Go! Green’s Randall Cutter was called in to drill two 4” wells to a depth of 180 feet each. In all aspects of the installation of these wells Go! Green did an outstanding job.
- The wells did MUCH less damage to my yard than trenches would have done. The trench would have been 6’ deep and 150’ long. A mess.
- The wells were much quicker. Both wells were done and pipe installed in about 1.5 days. In fact 150’ for each well was drilled in less than 4
hours through rock the entire way.
- The wells have no settlement issues and were very easy to grade over by hand.
- As an added benefit, I was able to determine that putting down a water well was not practical since no water showed up in my geothermal
wells.
- Go! Green Drilling handled all the related North Carolina paperwork and made sure the wells were correctly registered with the appropriate
ageny in Raleigh.
In the final analysis, we were very happy with the work done by Go! Green Drilling and specifically by Randall Cutter. I highly endorse their work.
Jeremy B. Fox. MBA, Ph.D. Professor of Management Appalachian State University
|
|
|
|
|
|
 |
|
|
|
Client: Climatech - Denver, NC Site: Charlotte, NC Services: 8 - 3/4" Vertical Loops to 100' Project Status: Completed 3/19/2010
|
|
|
|
|
|
 |
|
|
|
 |
|
 |
|
|
|
Client: Stagg Energy - Chesapeake, VA Site: Avon, NC Services: 5 - 3/4" Vertical Loops to 200' Project Status: Completed 3/25/2010
|
|
|
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
Client: Comfort Central - Pisquah Forest, NC Site: Marshall, NC Services: Install 1 - 1/4" x 450' Vertical Loop into an old water well. Project Status: Completed
|
|
|
|
|
 |
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
 |
|
|
|
 |
|
|
 |
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
Client: Evans Heating & Cooling, Inc. Site: Elkin, NC Services: 4 - 5.5" x 125' Vertical Boreholes w/ 2 - 3/4" Vertical Loops in each borehole. Project Status: Completed
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
 |
|
|
|
 |
|
 |
|
|
|
Client: Norris Mechanical - Harbinger, NC Site: Hertford, NC Services: 6 - 5.5" x 250' Vertical Boreholes w/ 3/4" x 255' Vertical Loop Project Status: Completed 11/27/2010
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
 |
|
|
|
 |
|
 |
|
|
|
Client: Norris Mechanical - Harbinger, NC Site: Camden, NC Services: 8 - 5.5" x 220' Vertical Boreholes w/ 3/4" x 225' Vertical Loops Project Status: Completed 2/5/2011
|
|
|
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
 |
|
|
|
 |
|
Client: Sunbelt Mechanical - Aberdeen, NC Lothridge Plumbing - Linwood, NC Site: West End, NC Services: 9 - 5.5" x 90' Vertical Boreholes w/ 1" x 95' Vertical Loops Project Status: Completed 2/18/2011
|
|
|
|
 |
|
|
|
|
|
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
 |
|
|
|
 |
|
|
|
Client: A&M Contractors - Ellerbe, NC Site: Pinehurst, NC Services: 7 - 5.5" x 160' Vertical Boreholes w/ 1" x 165' Vertical Loops Project Status: Completed 4/7/2011
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
 |
|
|
|
 |
|
Client: Standard Air - Morganton, NC Site: Morganton, NC Ground Floor unit: 2 ton Climatemaster Tranquility 27 – EP- Outdoor unit Model 26 (TTP 026) Two Stage – Var. Speed Services: 2 - 3.5" x 160' Vertical Boreholes w/ 3/4" x 165' Vertical Loops Main Floor unit: 2 ton Climatemaster Tranquility 27 – EarthPure Model 26 split unit upstairs (TT 0260) Two Stage – Var. Speed w/ Desuperheater. Services: 2 - 3.5" x 175' Vertical Boreholes w/ 3/4" x 180' Vertical Loops Project Status: Completed 6/25/2011
|
|
|
|
 |
|
|
|
|
 |
|
|
 |
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
 |
|
|
|
|
 |
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
Client: Asheville Geothermal - Asheville, NC Site: Asheville, NC 2 ton Climatemaster Heat Pump Services: 3 - 3.5" x 150' Vertical Boreholes w/ 1" x 155' Vertical Loops Project Status: Completed 8/25/2011
|
|
|
|
|
 |
|
|
 |
|
|
|
|
|
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
 |
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
 |
|
|
 |
|
 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
Client: JP's Plumbing & Heating - Statesville, NC Site: Statesville, NC 4 ton Trane Heat Pump Services: 4 - 3.5" x 170' Vertical Boreholes w/ 3/4" x 175' Vertical Loops Project Status: Completed 10/20/2011
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
Go! Green Drilling, Inc. 6105 Rest Home Rd. Claremont, NC 28610 828-367-1293 (office) 828-228-1695 (cell)
|
|
|
|
© Copyright 2010 Go! Green Drilling, Inc. Design by Randall E. Cutter
|
|
|