This Geothermal project was for a two story home in Asheville, NC. 2 story home with no previous heat pump or ducts.Electric base board heat was installed when the house was built with no AC. A new 2.5 ton Climatemaster unit was installed with new duct work. 3 - 3.5" x 150' Vertical Boreholes w/ 1" x 155' Vertical Loops Project Status: Completed 8/25/2011
This system should pay for itself in a short time as the homeowner stated her electric bills topped $600.00 per month.
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
Steep curvy driveway to the residence.
|
|
|
|
6' wide access to side yard drilling location.
|
|
|
|
|
|
 |
|
 |
|
|
|
This will be the drill area with boreholes spaced 15' apart.
|
|
View of house from side yard.
|
|
|
|
 |
|
 |
|
|
|
Another view of site access from driveway.
|
|
View of front of the house.
|
|
|
|
 |
|
 |
|
|
|
Steep driveway going back down. Could be trouble in the winter time!
|
|
Looking back up the driveway. Not many drill rigs would be able to access this residence.
|
|
|
|
 |
|
 |
|
|
|
|
The 1st borehole drilled with the 3/4" loop installed. The borehole will be grouted with the grout pipe on the loop reel and the casing will be pulled.
|
|
|
|
|
|
 |
|
|
|
|
|
|
Starting the 2nd borehole with a 6" Down-Hole-Hammer.
|
|
|
|
|
|
 |
|
|
|
|
Loop has been grouted and the casing has been removed.
|
|
|
|
|
|
 |
|
|
|
|
|
|
Another view of the header lines being connected to the vertical loops.
|
|
|
|
|
|
The loops are now connected to the header line and run to the house.
|
|
|
|
 |
|
|
|
The vertical loops and the header lines are all connected.
|
|
|
|
|
|
|
|