This Geothermal project was at Albemarle Plantation in Hertford, NC. A new 6.0 ton unit was installed. 6 - 5.5" x 250' boreholes were drilled with 3/4" x 255' loops in each borehole.
|
|
|
|
|
|
|
|
 |
|
|
|
|
 |
|
|
|
|
|
|
|
|
Good ole mud rotary drilling
|
|
|
|
|
|
The 1st of 6 boreholes to 250'
|
|
|
|
 |
|
|
|
 |
|
|
|
|
|
More mud rotary drilling.
|
|
|
|
Notice the loop reel on the side of the rig. It swings around over the borehole for easy installation.
|
|
|
|
|
|
 |
|
 |
|
|
|
Drill cuttings from the borehole.
|
|
|
|
All 6 -250' boreholes & loops completed.
|
|
|
|
|
|
 |
|
|
|
All boreholes complete. Now comes the cleanup.
|
|
|
|
|
|
|
|